DevOps & SREPDF + CSVFree

Production Readiness Review Checklist

Services reach production without on-call ownership, alerts, or runbooks because nothing blocks them. A readiness review is only useful if it is a gate with an owner who can say no, not a form filled in afterwards.

What you get

  • Criteria grouped by reliability, observability, security, and operability
  • A must-have versus should-have split, so the gate is realistic
  • An exception path with an expiry, for genuine launch pressure
  • A sign-off record naming who accepted the risk

How to use this template

  1. 1

    Run it before launch, not after. A review completed after a service is live is documentation, not a gate. Schedule it two to four weeks before launch so findings can actually be fixed.

  2. 2

    Separate must-have from should-have honestly. If everything blocks launch, the review gets bypassed under pressure. Keep the must-have list short enough that it is genuinely non-negotiable.

  3. 3

    Time-box every exception. Launches happen with gaps. Record the gap, who accepted it, what compensates, and when it will be closed, otherwise the gap becomes permanent and invisible.

What's inside

Here's a preview. Unlock the free download to get all 5 sections (4 more below).

Service details

Service name
Owning team
What it does, in one sentence

4 more sections in the full template

Plus the branded PDF and editable CSV.

Unlock the free download

Related templates

More free templates IT teams use alongside this one.

DevOps & SRE

Runbook Template

A runbook is read by a tired person at 03:00 who did not write it and does not know this service. That single constraint rules out most of what people put in runbooks: architecture background, rationale, and anything written in prose when it could have been a command.

Get template
DevOps & SRE

CI/CD Pipeline Checklist

A pipeline has production credentials and the authority to ship code, which makes it one of the most privileged systems you run, and usually one of the least reviewed.

Get template
DevOps & SRE

SLO Definition Worksheet

Most SLOs are picked because 99.9% sounds respectable, then never referenced again. An SLO is only useful if a specific number of bad minutes triggers a specific decision, so this worksheet makes you write the error budget policy before you pick the target.

Get template

Frequently asked questions

What is a production readiness review?

+

A gate before a service enters production, checking reliability, observability, security, and operability criteria. Its value comes from being a gate with an owner who can withhold approval, rather than a form completed after launch.

What should block a launch?

+

A short, genuinely non-negotiable list: named ownership and on-call coverage, user-facing alerts, a tested runbook, logging, backups with a tested restore, a tested rollback, secrets in a vault, and authentication on every endpoint.

How do you handle launches that cannot meet every criterion?

+

Record each gap as an exception with a compensating control, a named accepter, and a fix date. Launching with known gaps is normal; launching with undocumented gaps is how services end up permanently unmonitored.

Production Readiness Review Checklist (Free Template) |