Proof of Concept Plan & Scorecard

A POC without written success criteria becomes an extended demo that everyone enjoys and nobody can draw a conclusion from. Deciding in advance what would make this a failure is what turns a trial into evidence.

What you get

  • Success criteria defined before the POC starts
  • Realistic test scenarios using your own data
  • A scorecard completed by participants, not by the vendor
  • A go / no-go decision record

How to use this template

  1. 1

    Write success criteria first. What specifically must work, and to what standard, for this to be a pass? Criteria written afterwards get fitted to whatever the POC happened to show.

  2. 2

    Use your own data and your awkward cases. Vendor demo data is curated. Use your real data including the messy records, the unusual workflow, and the integration that always causes trouble. Those are what determine whether it works in production.

  3. 3

    Time-box it hard. Two to four weeks. POCs that drift become shadow production systems, and at that point the decision has been made by inertia rather than evidence.

What's inside

Here's a preview. Unlock the free download to get all 4 sections (3 more below).

POC scope

Vendor and product
What we are testing
The specific uncertainties the POC exists to resolve.
What we are NOT testing
Keeps scope from expanding into an implementation.

3 more sections in the full template

Plus the branded PDF and editable CSV.

Unlock the free download

Related templates

More free templates IT teams use alongside this one.

Vendor & Buying

Software Evaluation Scorecard

Most software evaluations are a decision already made, dressed in a scoring matrix afterwards. The two things that prevent that are locking weights before you see proposals, and requiring evidence rather than impressions in each cell.

Get template
Vendor & Buying

IT RFP Template

RFPs produce incomparable responses because each vendor answers in their own structure and prices in their own format. Fixing the requirement format and the pricing table is what makes a side-by-side comparison possible at all.

Get template
Vendor & Buying

TCO Comparison Worksheet

Licence price is the number vendors compete on and the smallest part of what you will spend. This worksheet forces in the costs that decide which option is actually cheaper: implementation, internal time, integration, and getting out again.

Get template

Frequently asked questions

How long should a proof of concept run?

+

Two to four weeks including setup. Longer POCs drift into shadow production, at which point switching away becomes disruptive and the decision has effectively been made by inertia rather than by evidence.

What makes a POC useful rather than a long demo?

+

Written success criteria with measurable pass conditions agreed before starting, your own real data including the awkward cases, participants doing their actual work, and a scorecard completed independently at the end.

Should the vendor run the POC?

+

They should support setup, but your own people must do the testing and the scoring. A vendor-driven POC demonstrates the product working in the hands of someone who knows every workaround, which is not the question you are trying to answer.

Proof of Concept Plan & Scorecard (Free Template) |